Products · ZenithMOS™
The digital tier board big plants use, built for yours.
Digital visual management is replacing the whiteboard across manufacturing, but most platforms are built and priced for large, mature enterprises. ZenithMOS™ is for the small and mid-size shops that need the same structure and discipline without the price tag or the IT project: structured tier meetings, KPI tracking (PSQDICM, SQDCP or your own) and automated escalation, built from the operating systems we've installed on the floor. Pulse runs the daily meeting. Solve fixes what it finds. Project plans the bigger work, and Audit checks the standard is held.
Pulse
BETADaily tier board · PSQDICM · Tier 1 by area and shift, Tier 2 for the plant
Solve
BETAWhen a miss needs more than a quick fix · corrective and preventive action
Project
NEW · BETAImprovement, capital and startup projects · a real multi-level plan
Audit
NEW · BETALayered process audits, 5S and your own checklists
More modules to follow: Kaizen, Standard Work, Skills and Uptime (maintenance). Beta testers help decide what we build next.
Free self-assessment
How strong is your plant's daily management?
Ten questions, three minutes. Get a maturity score and the three gaps to close first, each with a first step for this month.2-minute tour
From miss to fix in 2 minutes.
A missed KPI on the tier board, its reason codes, the escalation, the corrective action in Solve and proof the fix held. Plus All actions, project health, audit analysis and the one-click report.
Built around your factory
Your plant, your tiers, your KPIs.
No two plants run the same tier meeting, so ZenithMOS™ isn't one-size-fits-all. Every board is configured to match how your operation actually runs, and your demo is too.
How your custom demo works
Coming next for ZenithMOS™: a hosted multi-user version with automatic email, text and Teams alerts to owners, scheduled report delivery, and ERP-ready imports.
Services
Consulting for metals, critical materials and manufacturing.
We partner with metals producers and manufacturers to improve operations, scale production, and develop technically demanding markets.
Metals & Critical Materials Operations
Plant leadership and operating improvement across melting, refining, casting, forming, powder processing, and high-temperature production systems.
Industrial Market Development
Technical-commercial qualification, application alignment, account development, and U.S. market-entry support for specialized industrial suppliers.
Greenfield & Brownfield Startup
Capital planning, commissioning, operational readiness, and ramp execution from equipment installation through stable production.
Operational Excellence & Operating Systems
Lean improvement, standard work, performance metrics, daily management, and accountability systems built for sustained results.
Production Scale-Up & Reliability
Capacity, maintenance, engineering, quality, and supply-chain support to increase output while protecting process stability.
P&L & Site Leadership
Interim or fractional operating leadership for plants, business units, and industrial organizations in transition.
Tools & methods we deploy and sustain
Solstice Insights
Practical thinking for complex manufacturing operations.
Equipment Ready ≠ Production Ready
Commissioning proves that equipment can operate. Sustainable production also requires trained people, controlled processes, materials, quality, reliability, and leadership systems.
Read the post →Maximum Rate ≠ Optimum Flow
The objective is not to maximize every machine. It is to understand system demand, manage the true constraint, and rate-match the value stream from raw materials through finished goods.
Read the post →Where Is Performance Actually Being Lost?
A focused assessment identifies the few constraints, rate mismatches, and operating-system gaps that are limiting throughput—not merely a long list of observations.
Read the post →
About
Kenneth Harrison
Founder & Creator of ZenithMOS™ · Solstice International, LLC
I am a materials engineer and manufacturing executive who has designed, built, commissioned, led, and improved factories and production systems across advanced ceramics, ultra-high-purity metals and alloys, rare-earth magnetic materials, critical materials, and precision manufacturing.
My direct operating experience spans metal refining, alloy casting, vacuum induction melting and casting, forging, rolling, powder metallurgy, high-temperature thermal processing, precision machining, coatings, and product qualification. Through Solstice, I apply that plant-level perspective to operating strategy, production scale-up, equipment reliability, capital planning, and technical-commercial market development. ZenithMOS™ puts the same operating discipline in the hands of smaller plants.













